Rome Resources recently announced maiden tin production at its Kalayi project in the Democratic Republic of Congo.
The pilot mining operation at Kalayi has produced approximately 2,000 kilograms of approximately 58.5% contained tin concentrate, which equates to approximately 75% cassiterite, has been produced on site to date, to be sold at the local facility in Walikale.
The concentrate was produced by simple sorting and sluicing alone, with no complex processing required, with mineralisation running from surface in several of the cassiterite-bearing zones encountered, making the operation readily scalable.
Kalayi's inferred resource stands at 460,000 tonnes at 1.47% tin, for 6,760 tonnes of contained tin, a 45% increase during 2026, with 20,000 tonnes a realistic combined target.