- On the afternoon of June 29, Mr. Philco Zhang, Deputy General Manager, and Mr. Xaver Wang, Sales Manager of Etsingshan, visited Asian Metal and had a meeting with Chief Consultant Mr. Friday Gao, Analyst Mr. Xianghua Wang, and Analyst Ms. Caroline Li.
- Mr. Friday Gao first analyzed the aluminum production capacity distribution and current market movement of the global market with the Asian market in particular. Then, Mr. Xianghua Wang introduced the demands from different downstream fields and the price movements in China. At last, Ms. Caroline Li analyzed the global demand and the market movement of manganese flake.
- Mr. Philco Zhang introduced that Etsingshan's primary aluminum project in Indonesia with the first stage project production capacity of 250,000tpy was put into commerical operation from early April 2023 and will reach full operation from early July. Mr. Xaver Wang added that their group, supported by complete supply chain and logistics, has obvious advantage in the export market.
- As a subscriber of Asian Metal for years, Mr. Philco Zhang expressed their willingness to strengthen cooperation and communication between two parties in the future.
From left: Xaver Wang, Friday Gao, Philco Zhang, Caroline Li, Xianghua Wang